return
return

Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home Projects Upper Clinch Streambank Sedimentation Project

Upper Clinch Streambank Sedimentation Project

The project focuses on reducing sedimentation in the upper Clinch River watershed through streambank stabilization projects. Methods will include bioengineering techniques, grading, and installation of toe protection. Projects will be concentrated in developed areas of the watershed, as well as collaboration with the local soil and water conservation district.

Smaller geography (stream reach, county-level etc.)
Back to Top